UTILITIES

Guildford Sub-Station

Project Value: $

This project was performed in a live substation and involved the reconstruction of three connected transformer bunds. The existing slabs and bund walls were demolished and replaced with new high strength slab higher bund wall. In addition, structural steel louvres were installed  to prevent the spread of transformer oil in the unlikely event of an explosion.

Similar works were also performed for Integral energy at Bow Bowing  and Moss Vale Substations

Photos will be uploaded in the near future.

   
   
 