Guildford Sub-Station
Project Value: $
This project was performed in a live substation and involved the reconstruction of three connected transformer bunds. The existing slabs and bund walls were demolished and replaced with new high strength slab higher bund wall. In addition, structural steel louvres were installed to prevent the spread of transformer oil in the unlikely event of an explosion.
Similar works were also performed for Integral energy at Bow Bowing and Moss Vale Substations